Issue one design basis
Attach the room schedule, layout, operating conditions, product loading and scope split. Identify anything that is still provisional.
Separate technical and commercial schedules
Ask suppliers to confirm selection basis, exclusions, power requirements, documentation, availability and commercial terms in a consistent structure.
Control revisions
Mark the BOQ, drawing and specification revision clearly. A quotation against an old requirement is not comparable with a quotation against the current issue.