Refrigeration considerations
Distinguish pre-cooling duty from storage duty.
Coordinate equipment selection with packhouse throughput.

Cold-chain procurement connecting receiving, grading, packing, pre-cooling and dispatch functions.
Commodity flow, field heat, processing rate and dispatch schedule determine the cooling and room requirements.
Distinguish pre-cooling duty from storage duty.
Coordinate equipment selection with packhouse throughput.
Plan temperature-zone separation around process flow.
Coordinate doors, drains and panels with packing operations.
Coordinate product flow, door movement and service access before equipment selection.
Confirm floor, drainage, electrical and structural interfaces in the approved layout.
Final scope follows the operating requirement and technical review.
Share room size, product load, target conditions, site location and project stage for review.